| Medical Supply
Manufacturer, Cleveland, Ohio |
| Problem: |
Short production runs and frequent
changeover of parts was causing this manufacturer to experience low utilization
rates for its machining centers due to the frequent fixture changeovers.
The plant operates three machining centers, three shifts a day, with each
machine making an average of six fixture changes a day at 20 minutes per
change. Average downtime per machine was 120 minutes a day or 8.3% of
available machine time. |
| Solution: |
Jergens Quick Change Ball Lock System |
| Results: |
Average fixture changeover time has been
reduced to 5 minutes per change saving 90 minutes per machine per day.
Using an average of $75 per machine hour, this company has increased its
production by over $84,000 annually. (3 Machining Centers X 1.5 Hours/Day X
$75/Hour X 250 Days) |
|
|
|
| Aerospace Parts Supplier,
Akron, Ohio |
| Problem: |
A slow economy and increasing
competition required this company to reduce its manufacturing costs. The
company has an application in which it produces 30,000 parts requiring a .217
hole drilled 1" deep. The original method used a high speed steel jobber
drill costing $1.50 with life expectancy of 300 holes and a cycle time of 24.6
seconds per part. Using a machine time of $60 per hour, total machining
costs were $12,900 to produce the 30,000 holes. |
| Solution: |
Titex Coolant Fed Carbide Drill |
| Results: |
Cycle time has been reduced to 3.6
seconds per part; life expectancy increased to 1,125 holes per drill and the
overall machining costs for the 30,000 holes has decreased to $3,300, by using
this $56.78 Titex coolant fed solid carbide drill. Overall cost savings
are $9,600 annually on this application. |
|
|
|
|
|